Client
Winchester Homes
This phase of the overall project involves the construction of the following new buildings and amenity features:
This building project includes concrete foundation, slab on grade structural concrete, complete wood construction retaining walls with natural stone veneer, finish carpentry, interior custom millwork, waterproofing & damproofing, spray foam/blown in insulation, built up roof system with custom metal roofing, aluminum entry systems, stile & rail wood doors, fabricated steel stairway with concrete treads, gypsum wall assemblies, ceramic tile finishes, custom ceiling trims, stone/resilient/hardwood floor coverings, custom finish paintings, food preparation/warming kitchens, lockers & toilet accessories, plumbing, HVAC, and electrical systems.
The site project (approximately 5 acres) includes three swimming pools, parking areas, sidewalks, landscape features, plantings, asphalt paving, curbs, signage, fencing, field stone walls, finish lawns.
Winchester Homes
Clarksburg Maryland
31,953 Sq-ft
Mixed-Use
2016

Bayview Medical Office Building